This project was carried out during the summer holidays ensuring minimal disruption to our client. The first step was to prepare the existing timber floors using a copper disk to remove any loose material before using Super Flex 30 to screed the floors ready for the vinyl to be laid. To finish off we silicone sealed the perimeter and relayed existing entrance matting.
LES Eden Hall
Challenge
Preparing existing timber floors using a copper disc to remove any loose material.
Overlay subfloor with sheet vinyl.
Works to be carried out during summer holidays.
Large area to be fit in line with contracts programme.
Solution
Materials Used
Forbo Modul Up Compact 2m – Blond Chill Oak
Ardex Feather Finish
Ultra Floor Level It Super Flex 30
Forbo Weld
FL390 Levelling Compound
F Ball F41 Tackifier