Challenge

Arranging deliveries in a timely way so they don’t interfere with other trades

Extensive sub floor preparation and installation of LVT to large areas

Ensuring handover in line with the contracts programme

Existing water damaged wood block floor required removal

Solution

The project was carried out ensuring minimal disruption to the Shoe Zone store. The first step involved the careful removal of the damaged wood block floor to reveal the concrete subfloor. This was then levelled out with a new pumped screed floor at a depth of up to 50mm. We then incorporated a new DPM system to protect the new flooring from dampness. Finally, we installed the new LVT flooring, chosen for its durability, aesthetic appeal, and ease of maintenance.

Materials Used

Pumped screed by Mapei 3240 with gritted primer DPM

F Ball F49 – Pressure Sensitive Adhesive

Ardex Adurapid - Rapid setting screed

Gradus Tag Trim

Moduleo LVT supplied by the client